Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяБыл на сайте вчера в 23:07
Кандидат
Мужчина, 33 года, родился 27 августа 1991
Активно ищет работу
Волгоград, не готов к переезду, готов к командировкам
Commissioning Lead Engineer
Специализации:
- Другое
Занятость: полная занятость, частичная занятость, проектная работа
График работы: полный день, сменный график, гибкий график, удаленная работа, вахтовый метод
Опыт работы 13 лет 5 месяцев
Ноябрь 2021 — по настоящее время
3 года 7 месяцев
Arctic LNG 2
Commissioning Electrical Manager
Management of the electrical commissioning department within the customer's structure. Control of commissioning work of contractors on the part of the customer. Planning and monitoring the implementation of commissioning work by electrical contractors, acceptance of electrical equipment from construction and installation work to commissioning work. Calculation of load consumption for commissioning and equipment conservation. Review and comment on techniques, procedures and programs for commissioning. Checking the scope of work completed by commissioning contractors, signing KS-2 forms and time sheets. Monitoring the progress, timing and scope of commissioning work in accordance with the plant construction schedule. Monitoring and maintaining records of all inspections and tests required at the commissioning stage in accordance with the quality control plan and the control and testing plan for electrical equipment in accordance with Russian and international standards and regulations.
Февраль 2020 — Ноябрь 2021
1 год 10 месяцев
Свободный, www.met-ts.co.uk/
Услуги для бизнеса... Показать еще
Commissioning Electrical Superintendent
Realization of the project “Amur Gas Processing Plant”. Promote and comply with applicable safety instructions and other COMPANY HSE procedures in all areas of activity. Check and control the availability of drawings, specifications, work instructions, materials and tools. Control of the detailed daily and weekly work plans of the Contractor in accordance with the general planning schedule. I am responsible for daily monitoring of the commissioning progress and for daily reports. I monitor the contractor's labor resources in accordance with the approved mobilization plan. Reviewing contractors' construction schedules to ensure they include all required activities in the form of a realistic timeline, logical sequence, and enough resources to meet the deadline. Identifying and tracking any Inconsistencies related to prior approval. Commissioning of 3 substations 110/10 kV, dry and oiled transformers, motors, pumps, high-voltage compressors, 10 / 0.4 kV substations, diesel generator sets, etc.
Апрель 2019 — Февраль 2020
11 месяцев
Свободный, www.met-ts.co.uk/
Услуги для бизнеса... Показать еще
Electrical Supervisor
Realization of the project “Amur Gas Processing Plant”. Technical supervision of the execution of electrical installation and construction works by foreign and Russian construction contractors at the company's construction sites. Quality control of work performance, quality of materials and products used. Planning and organization of construction contractors. Decision-making on the prevention and elimination of measures that cause failure of the deadline and deterioration of the quality of construction and installation works. Interaction with the field engineering department, coordination of deviations from the project in the author's supervision. Control of installation and connection of supply and exhaust HVAC. Setting the air draft of ventilation HVAC. Control over the installation of air ducts. Reporting on completed construction and installation work and preparing the necessary data for reporting on the implementation of construction plans.
Май 2018 — Март 2019
11 месяцев
TechnipFMC
Commissioning Lead Engineer
Work in the service of the general contractor, commissioning at the power facilities 0.4 - 110kV, work in the group. Analysis of working documentation of construction sites. Competent and effective work at the facilities, excluding the failure of construction deadlines and safety violations. Development of programs for conducting the NDP. Checking the ID protocols of adjustment and testing of electrical equipment. Preparation and coordination of instructions for the operation of RZA, ASUTP, TM, SSPI, AIISKUEV, interaction with adjacent adjustment organizations when conducting NDP at sites. Interaction with the Customer's technical services, design institutes in the implementation of the construction project and the commissioning of facilities. Control of installation and connection of supply and exhaust HVAC. Setting the air draft of ventilation HVAC. Control over the installation of air ducts. Production of commissioning works for transformer substations, gas turbine units, engines, compressors and the Raychem satellite electric heating system.
Июнь 2017 — Май 2018
1 год
OOO Pentair RUS
Commissioning Lead Engineer
Construction of modules on the Yard for the Yamal LNG project. The organization of the work of the PCC department, setting the task for the engineers of the PCC, conducting trainings with contractors for working with Raychem equipment, daily reporting at meetings about the work done by the department. Setting NGC-20, NGC-30 and NGC-40 on the site. Programming CPZ panels, working with COMEKA panels in substations, Programming NGC-20 with CMA from Raychem. Work in the program Pentair Supervisor. Configuring RS485 circuits to collect information in CPZ panels. Work in the database EASYPLANT.
Май 2016 — Июнь 2017
1 год 2 месяца
OOO Renaissance Heavy Industries
QC Lead Engineer
OOO Renaissance Heavy Industries, a limited liability company, YaNAO, Sabetta
Construction of the Yamal LNG plant in Sabetta settlement. Construction of a gas turbine power station. Preparation of acts, protocols of electrical installation works at the construction site. Participation in the site inspections; documentation preparation in the course of works and upon their completion; preparation of as-built documentation (logs work, as-built drawings, acts, certificates etc.). Organization of instrumentation and valves verification, receipt of instruments' certificates. Work as a welding inspector in the workshop. Work as a leading inspector of electrical works at the site. Work organization in the QC department, distribution of tasks between inspectors and control over their performance. Control over installation of instrumentation, safety valves, dampers; verification of piping installation and piping spool fabrication; installation of tanks, pumping and compressor stations, electric motors, and pressurized vessels. Work with the equipment manufactured by Siemens, ABB, and Schneider Electric. Work with the Raychem heating cables and equipment. Check on specifications to comply with the quality requirements, getting ITP approval. Collaboration with vendors regarding quality issues, participation in incoming control of the supplied equipment at the construction site. Work in the database EASYPLANT.
Июнь 2015 — Май 2016
1 год
OOO LUKOIL Volgogradneftepererabotka
QC Lead Engineer
OOO LUKOIL Volgogradneftepererabotka (Volgograd oil refinery), a limited liability company
Position held: QC Lead Engineer (full-time employment) working for OOO Renaissance Heavy Industries, a limited liability company
Construction of facilities for processing sulfur and hydrogen at the refinery plant "LUKOIL Volgograd." Preparation of acts, protocols of electrical installation works at the construction site. Participation in the site inspections, documentation preparation in the course of works and upon their completion; preparation of as-built documentation (logs work, as-built drawings, acts, certificates etc.). Organization instrumentation and valves verification, receipt of instruments' certificates. Work as a welding inspector in the workshop. Work as a leading inspector of electrical works at the site. Work organization in the QC department, distribution of tasks between inspectors and control over their performance. Control over installation of instrumentation, safety valves, and dampers; verification of piping installation and piping spool fabrication; installation of tanks, pumping and compressor stations, electric motors, and pressurized vessels. Work with the equipment manufactured by Siemens, ABB, and Schneider Electric. Work with the Pentair heating cables and equipment. Check on specifications to comply with the quality requirements, getting ITP approval. Collaboration with vendors regarding quality issues, participation of incoming control of the supplied equipment at the construction site.
Февраль 2015 — Июнь 2015
5 месяцев
OOO Tiamat
Chief power engineer
Equipment operation of the offices and warehouses networks. Responsible for the electrical facilities, preparation of technical documentation, work with electrical grids and electric power supply, the water treatment plant. Work with leaseholders, billing. Work with pressurized vessels, ventilation equipment, chillers and fancoils McQuay, pumping and compressor equipment.
Декабрь 2013 — Июнь 2014
7 месяцев
OOO AhtubaStroyMontazh
Electrical engineer
Operation of the equipment of the Main Media Centre during the Olympic Games. Head shift manager, operational switching operator. Work with pressurized vessels, ventilation equipment, chillers and fancoils manufactured by General Climate. Work with the Siemens, ABB, Schneider Electric equipment in the substations and diesel generators manufactured by Caterpillar.
Ноябрь 2013 — Январь 2014
3 месяца
OOO Prombytmontazh
electrical engineer
Hand-over of tech documentation to the client, control over technical documentation preparation, and inspection of electrical works performance. Verification of installation of the boiler equipment manufactured by Wanson, Astebo, GekaKonus for accommodation and industrial facilities.
Сентябрь 2012 — Ноябрь 2013
1 год 3 месяца
OOO EnergoCapital
electrical engineer
Operation of the shopping center's equipment and networks. Deputy of the specialist responsible for electrical facilities. Preparation of technical documentation. Work with pressurized vessels, ventilation equipment, chillers and fancoils manufactured by McQuay and TRANE, pumping and fire-extinguishing equipment.
Август 2012 — Сентябрь 2012
2 месяца
OOO ElektroBild
wireman
Installation of the substation equipment, cable and overhead lines 6 and 0.4 kV. Installation of power and lighting equipment in the residential buildings and real estate facilities.
Июнь 2011 — Август 2012
1 год 3 месяца
Army
electrical technician
Maintenance and repair of the electrical equipment of the military training area; airborne forces, Stavropol.
Навыки
Уровни владения навыками
Опыт вождения
Имеется собственный автомобиль
Права категории BОбо мне
Construction site, Sabetta settlement, Substations, Gas Turbines, implementation of the construction project and the commissioning, Audit, documentation preparation, Power Stations, Oil Refineries, responsible for electrical facilities, technical documentation preparation, Residential Buildings, Operations and Maintenance, Responsible for the electrical facilities, Water Treatment, Siemens Hardware
Высшее образование
2015
Volgograd State Agrarian University
Faculty of Electricity, Major- power engineer
2011
Volgograd economical and technical college
Major- power engineer, Major - technical operation and maintenance of electrical and electromechanical equipment
Знание языков
Гражданство, время в пути до работы
Гражданство: Россия
Разрешение на работу: Россия
Желательное время в пути до работы: Не имеет значения